Work we are happy to be judged on.
Filter by trade to see comparable projects, including scope, location and how long each one took on site.
Recent projects, start to finish.
Occupied condo repaint
PittsburghFull unit repaint around the owner’s furniture, with floor-to-ceiling glass masked and protected.
Community hall floor replacement
PittsburghCommercial-grade luxury vinyl plank laid across a hall floor over a levelled subfloor.
Office partition build
PittsburghTwo private offices framed out of open-plan floor space, worked outside trading hours.
Basement boarding and finishing
PittsburghExposed insulation and framing boarded, taped and finished ready for decoration.
Basement games room repaint
PittsburghDeep blue walls, crisp white ceiling and full floor protection in an occupied basement.
Ensuite with hex feature wall
PittsburghFrameless glass enclosure, patterned hex feature wall, floating vanity and rain head.
Large-format shower tiling
PittsburghMarble-effect porcelain to the ceiling with a recessed niche and a hex-mosaic shelf.
Basement suite with kitchenette
PittsburghFull basement conversion: framing, boarding, kitchenette, bathroom and luxury vinyl plank throughout.
Exterior siding repaint
PittsburghTired red siding taken back to a sound surface and repainted in a two-tone slate and cream scheme.
Matte graphite kitchen refit
PittsburghGloss white units replaced with matte graphite doors and a veined quartz worktop, reusing the existing carcasses.
Full shingle re-roof,
PittsburghCurling, blistered shingles stripped back to deck and replaced with architectural shingles, new vents and flashings.
What the owners said afterwards.
Third project with them now. The tiling in our ensuite is the sharpest work I have seen in twenty years of owning older houses.
The estimate came line by line, so I could cut two items to hit my budget instead of receiving a vague number and a shrug. Refreshing.
A storm took half our flashing off on a Sunday night. Someone was on the roof by eight the next morning and the permanent repair was quoted the same week.
We manage twenty-two units and Kept Fix now handles all of it. One invoice, one contact, and turnovers that genuinely finish before the new tenant arrives.
They gutted and rebuilt our kitchen in nine working days and the house stayed liveable throughout. The site lead sent photographs every evening, so I never once had to chase anyone for an update.
Ready to transform your property?
Send us the rooms, the address and a rough timeline. You will have a written, line-item estimate within two working days.
