Bathroom renovation
Full strip-outs through to wet rooms — tanked, tiled and pressure-tested before anything is closed up.

Bathrooms fail at the joints, not the tiles. We tank the wet zone properly, set falls before the screed goes down, and pressure-test every connection while the wall is still open. Extraction is sized for the room and ducted to the outside, not into a void, which is the single most common cause of the mould that returns six months after a cheap refit.
We handle bath-to-shower conversions, ensuites carved out of a bedroom corner, and full accessible wet rooms with level thresholds. A typical family bathroom takes seven to ten working days, and we agree a single day of water isolation up front so the rest of the house keeps running.
Tell us about the job.
Send the details and a project manager will call within one working day to arrange a site visit. Estimates are written, itemised and free.
